Route of 450 metres combined with directional drilling
The DN600 AC main pipeline in the Officiersvliet in Zwijndrecht required replacement. We took responsibility for the engineering and management for this project. The newly constructed pipeline part measuring 450 metres concerns a DN400 steel pipeline, combined with directional drilling in a 500 HDPE.
Activities
During this project we offered support to grid operator Oasen by carrying out the detail engineering of the new water pipeline along with the route and detail drawings.
The piping is replaced by directional drilling. The calculations and design were prepared for the drilling, and specifications/a work description for the civil activities were drawn up. Then a management budget was drawn up for an HSE plan design phase, the licence applications were taken care of, and construction planning was put in place. Drawing up construction planning.
In the execution phase we also offered support with management and supervision of the execution of the project.